All of the plywood has been cut to size and shape. I have finished the blue 1/2 inch foam on all of the modules and the 1 inch pink foam on three modules. On three modules I am ready to install track. Joe
The layout is on hold for now, until we have finished moving. All of the modules have been cut and have the blue 1/2in. insulation foam. Four modules have the pink 1in. insulation foam. Three modules have all of the track installed. Module 05 is complete with track and scenery. Needs face boards. L-Girder supports are assembled and ready for final setup. Currently working on my Ft Smith Depot with columns on the north end. About 20% complete.. Joe