Boston Mountain Sub Division

N Scale Shelf Layout

Joe Lovett, Jul 22, 2015
Cynthia likes this.
    • Joe Lovett
      All of the plywood has been cut to size and shape. I have finished the blue 1/2 inch foam on all of the modules and the 1 inch pink foam on three modules. On three modules I am ready to install track.

      Joe
      Cynthia likes this.
    • Joe Lovett
      The layout is on hold for now, until we have finished moving.

      All of the modules have been cut and have the blue 1/2in. insulation foam.

      Four modules have the pink 1in. insulation foam.

      Three modules have all of the track installed.

      Module 05 is complete with track and scenery. Needs face boards.

      L-Girder supports are assembled and ready for final setup.

      Currently working on my Ft Smith Depot with columns on the north end. About 20% complete..

      Joe
      Cynthia likes this.
    • Rating:
      5/5,
      William Jackson
      Very nice review, for those who are starting a new layout Great
      Cynthia likes this.
    There are no comments to display.