Neosho River Crossing - Bridge 173.3 - Miami, OK, MP 172.5 - Afton Subdivision Neosho River crossing Frisco Bridge at Miami, OK. FM Edit 1/31/2024: The bridge has been replaced by three 77'-6" deck plate girder (DPG) spans and one 67'-4" deck plate girder (DPG) span. The total length of the steel spans is 299'-10". The through pin connected truss was replaced by the three 77'-6" spans in 1955. An additional 67'-4" span was added in 1970. Added bridge narrative details, number, mile post and subdivision. MKD
Neosho River Crossing - Bridge 173.3 - Miami, OK, MP 172.5 - Afton Subdivision Frisco bridge at Miami, OK in 2009. Edit 1/31/2024: Steel portion of bridge consists of three 77'-6" deck plate girders (DPG) fabricated in 1955 and one 67'-4" deck plate girder (DPG) fabricated in 1970. Total steel section measures 299'-10". Added river, bridge details, number, mile posts and subdivision. MKD