Neosho River Crossing - Bridge 173.3 - Miami, OK, MP 172.5 - Afton Subdivision

Discussion in 'Bridges' started by Frisco Meteor, Apr 14, 2006.

  1. Neosho River Crossing - Bridge 173.3 - Miami, OK, MP 172.5 - Afton Subdivision

    Neosho River crossing Frisco Bridge at Miami, OK.

    FM

    Edit 1/31/2024: The bridge has been replaced by three 77'-6" deck plate girder (DPG) spans and one 67'-4" deck plate girder (DPG) span.

    The total length of the steel spans is 299'-10".

    The through pin connected truss was replaced by the three 77'-6" spans in 1955. An additional 67'-4" span was added in 1970.

    Added bridge narrative details, number, mile post and subdivision.
    MKD
     

    Attached Files:

    Last edited by a moderator: Feb 2, 2024
  2. railroadguy65

    railroadguy65 Member

    Neosho River Crossing - Bridge 173.3 - Miami, OK, MP 172.5 - Afton Subdivision

    Frisco bridge at Miami, OK in 2009. :)

    Edit 1/31/2024: Steel portion of bridge consists of three 77'-6" deck plate girders (DPG) fabricated in 1955 and one 67'-4" deck plate girder (DPG) fabricated in 1970. Total steel section measures 299'-10".

    Added river, bridge details, number, mile posts and subdivision.
    MKD
     

    Attached Files:

    Last edited by a moderator: Feb 2, 2024
    Ozarktraveler likes this.

Share This Page