Hunter Branch - Hoxie Subdivision - Stations And Mile Posts - Mingo to Hunter, MO M.P. Station-------- Blt.- Aban. P.C.-- County- 2.7 Mingo---------- 1884 1941 CG&SW Stoddard 5.1 Moon's Mill----- 1884 1941 CG&SW Wayne? 6.7 Wappapello---- 1884 1941 CG&SW Wayne 8.0 Ferry's-------- 1887 1939 CG&SW Wayne 9.9 Butler--------- 1887 1939 CG&SW Wayne 13.1 Chaonia------ 1887 1939 CG&SW Wayne 15.5 Wilson's------ 1888 1939 CG&SW Wayne 16.9 Jewell-------- 1888 1939 CG&SW Wayne 17.2 Ojibway------ 1888 1939 CG&SW Wayne 20.4 Taskee------- 1888 1939 CG&SW Wayne 21.5 Ladero------- 1888 1939 CG&SW Wayne 23.3 Barrett Mine-- 1888 1939 CG&SW Wayne 23.0 Doubling Track---1888 1939 CG&SW Wayne 27.0 Williamsville--- 1888 1939 CG&SW Wayne 33.9 Upalika------- 1889 1938 CG&SW Wayne 35.3 Pond--------- 1889 1938 CG&SW Wayne 36.3 Holladay------ 1889 1938 CG&SW Wayne 37.7 Orchard------ 1889 1938 CG&SW Carter 39.6 Hilltop-------- 1889 1938 CG&SW Carter 41.1 Elsinore------- 1889 1938 CG&SW Carter 45.4 Jct. Switch---- 1889 1938 CG&SW Carter 48.6 Grandin Jct.--- 1889 1938 CG&SW Carter 49.1 Hunter-------- 1889 1938 CG&SW Carter Predecessor Company 1) CG&SW - Cape Girardeau And Southwestern Railway Notes 1) Connects with Hoxie Subdivision at Mingo. 2) Completed to Wappapello 9/1/1884. 3) Completed to Chaonia 4/1/1887, construction resumes westward 3/1888. 4) Interchanges with Missouri Pacific (MP) and Williamsville, Greenville And St. Louis (WG&SL) Railroad at Williamsville. 5) Completed to Ellsinore 3/1889. 6) Interchanges with Missouri Lumber And Mining Company (ML&MC) Railroad, logging railroad, at Junction Switch. 7) Completed to Hunter 4/1/1889. 8) All station agents and depots closed from Ferry's to Hunter on 8/17/1933. 9) The Wappapello to Williamsville abandonment was delayed to transport materials to the Chaonia area for work on the Wappapello Dam. In May 1939, Frisco trustees received permission from the ICC to abandon the track. In June 1939, Frisco put a crew of men to work on removing the bridge at Chaonia and the tracks from Wappapello to Williamsville. The salvage work was completed by the end of June 1939. The Mingo to Wappapello branch was abandoned after the completion of the dam. 10) Connects with Current River Branch, Willow Springs to Grandin, at Hunter. 11) Orchard to Upalika right-of-way converted in to a gravel road after abandonment.