Boston Mountains Sub-Division

Discussion in 'N Scale' started by Joe Lovett, Jul 15, 2015.

  1. Joe Lovett

    Joe Lovett Member

    I made a mistake on the template for the coal mine, size is wrong, should be three inches wide instead of four. The new template has seven poles made from 0.100 inch wood Qtips 0.75 inches long and 0.125" square Balsa wood top beams four inches long. Cross braces are going to be six styrene stripes 0.060 by 0.010 inches.

    Edit: Added photo.

    Joe

    20211205_085712.jpg
     
    Last edited: Dec 5, 2021
  2. Joe Lovett

    Joe Lovett Member

    I've been moving all of the big items from storage the last three days and haven't worked on anything layout related. This morning I'm going to continue cutting poles and beams for the bents for coal mine. Need to go to Hobby Town to purchase some 0.060 by 0.010 inch strip styrene this afternoon and start bent assembly.

    Joe
     
  3. Joe Lovett

    Joe Lovett Member

    Just finished one bent.

    Joe

    20211208_234013.jpg 20211209_000218.jpg 20211209_104123.jpg
     
  4. Joe Lovett

    Joe Lovett Member

    I moved four modules from storage this afternoon and set up the Arkansas River Bridge in the living room to see how much damage. It's a mess, will take a lot of time to repair. The brown span and south lift tower are the worst. May have to replace the the side trusses, luckily the kit came with extra trusses.

    Joe

    20211209_155714.jpg

    20211209_155723.jpg

    20211209_155758.jpg

    Gabby said she would help, as you can see she's all excited. She will be 19 years old in March.
    20211209_155939.jpg
     
  5. mark

    mark Staff Member Staff Member

    Joe,

    Don't despair. Looks like a great opportunity to invest resources and build back better.

    At the same time you can improve the rigging to more closely represent the prototype. This was discussed in some detail in earlier posts (474, 475, 476) on page 24 of this thread.

    Hope this helps.

    Thanks!

    Mark
     
    Last edited: Dec 10, 2021
  6. Joe Lovett

    Joe Lovett Member

    I remember what you said about the rigging, this will be a good time to make changes. Thank you Mark.
     
  7. Joe Lovett

    Joe Lovett Member

    This afternoon I disassembled the bridge and gave each one a good look over. Its not as bad as I thought, just a few pieces to glue back on.

    My hobby time is maybe a hour each day here lately. On my previous layout most of the eight modules were built hour/day before I went to work. This was around 2002 & 03, had trains running just before I retired. It was my second try on medium sized layouts.

    Joe
     
  8. skyraider

    skyraider Member

    That is an impressive bridge!! Any progress?

    Did you know I used to model N scale? Age and the resultant eyesight change moved me to HO and HOn3. If space weren't such an issue, I'd probably switch to O scale!!!

    Paul Moore
     
  9. Joe Lovett

    Joe Lovett Member

    Thank you Paul. I haven't been able to work on the layout for some time, too many things going on. Will explain in the Hi from Broken Arrow thread..
     
    Ozarktraveler likes this.