Seligman and Beyond layout

Discussion in 'General' started by Ozarktraveler, Mar 15, 2017.

  1. Ozarktraveler

    Ozarktraveler Member

    20220611_135209.jpg 20220611_135227.jpg

    Track is down for main loop except for the approximately 36" section over the river. The Fast Tracks turnouts Keith R. sold me were just the ticket, working nicely in the section adjacent to the river.

    Main power buss is run under the whole layout. 1/3 of the loop is powered and operational.

    Need to cut gaps into three way turnout to isolate the frogs.
     
  2. patrick flory

    patrick flory Member

    Wish I had a room like that.
     
  3. Ozarktraveler

    Ozarktraveler Member

    Its a blessing.
     
    Joe Lovett and WindsorSpring like this.
  4. patrick flory

    patrick flory Member

    It’s exactly what I’d like. A walkaround about about 20x30 looks like. Enough for some distance. When in the middle you can’t see the whole layout, gets a sense of distance. Surface just wide enough for track and related scenery.
     
    Ozarktraveler likes this.
  5. Ozarktraveler

    Ozarktraveler Member

    20220617_201730.jpg 20220617_201647.jpg

    Dropped 40-50 feeder wires thru the foam boards.

    Added color to the river banks.
    Ordered the bridge today, local hobby shop didn't have it in stock.
     
  6. Looks great Craig. Keep it up. You are making nice progress.
     
    Ozarktraveler likes this.

Share This Page