Karl Stevenson

Le Flore depot at ORM 4-19-2019

More siding up on bay side of depot. Refurbished waiting room door in place with new handles, locks and frames around doors/windows.. More siding going up on east end of depot (to right). Finish work being done on west end side of depot (to left).

Le Flore depot at ORM 4-19-2019
Karl Stevenson, Apr 20, 2019
mountaincreekar likes this.
    • Karl Stevenson
      This was once the track side of the depot. In its present orientation this side faces due south. Street in front goes to original museum visitor parking area with additional new parking area slightly to left of depot behind scaffolding on left. This side of depot exterior nearing completion.
    There are no comments to display.
  • Category:
    Frisco Photos
    Uploaded By:
    Karl Stevenson
    Date:
    Apr 20, 2019
    View Count:
    84
    Comment Count:
    1